Space 1999 Eagle Transporter Forum


Go Back   Space 1999 Eagle Transporter Forum > Deep Space Tracking Station > A Matter of Balance

Notices

SPONSORED BY
&

Reply Bookmark and Share
 
Thread Tools Display Modes
Old 09-07-2009, 04:28 AM   #1
eaglewingone
Communications Officer
 
eaglewingone's Avatar
 
Join Date: Apr 2009
Location: Los Angeles,CA
Posts: 1,206
Default Stacking Of New Space Vehicle Begins At Kennedy Space Center

For the first time in more than a quarter-century, a new space vehicle will begin stacking on a mobile launch platform (MLP) at Kennedy Space Center, thanks to the hard work and dedication of an experienced team of employees from NASA and contractors United Space Alliance (USA) and Alliant Techsystems.
The Ares I-X aft skirt, which was mated to a solid fuel segment in the Rotation, Processing and Surge Facility at KSC, rolled over to the 528-foot-tall Vehicle Assembly Building, where it will be lifted and placed on the MLP in High Bay 3.

On that platform, workers will secure the aft booster and continue adding segments of the first stage rocket, the upper stage simulators, the crew module mockup and the launch abort system simulator, taking the vehicle to a height of 327 feet.

Once complete, the Ares I-X rocket will roll to Launch Pad 39B for the first test flight of the vehicle later this year. This vehicle is part of NASA's Constellation Program, which aims to send humans back to the Moon and beyond.

"We are excited to be a part of the NASA team working toward this important Ares milestone," said Mark Nappi, Vice President of Launch and Recovery Systems for United Space Alliance. USA, NASA's prime human spaceflight operations contractor, has been tasked by NASA with planning and processing for the test flight.

"Processing for the Ares I-X test flight in parallel with Space Shuttle operations has been a true challenge involving people and hardware from across the country. Working two human spaceflight programs in parallel is new territory for NASA and for its contractor partners, and we're very proud of what we've accomplished," Nappi added.

The Ares I-X test flight is aimed primarily at testing the performance of the first stage rocket.

"As we reach this critical processing milestone, we reflect on the tremendous amount of work this team has completed over the last three years," said Robert Herman, Florida site director for ATK, NASA's prime contractor for the Ares I first stage rocket.

"We are honored to play a critical role in the future of America's human space flight program, and the Ares I-X flight test is the proof of concept that Ares I will build on."

USA is teamed with ATK on the design, production and processing of the Ares I First Stage. Assembly and integration work on the Ares I-X aft skirt, forward assembly and fifth motor segment simulator, the deceleration parachutes, the thrust Vector control subsystem hardware and the avionics and pyrotechnics was performed at KSC. The four solid motor segments were delivered by ATK from its Utah facility.

"It has taken a great team effort to get us to this point, and we are all looking forward to working together as we move to the next phase of the Ares I program," Nappi said.
eaglewingone is off duty   Bookmark and Share Reply With Quote
Old 09-07-2009, 03:19 PM   #2
Dr Kane
Communications Officer
 
Dr Kane's Avatar
 
Join Date: Sep 2007
Location: Melbourne, Australia
Posts: 1,458
Default

Thanks for that. There are some nice pics at: http://www.flickr.com/groups/ares/pool/
Dr Kane is off duty   Bookmark and Share Reply With Quote
Old 09-07-2009, 11:08 PM   #3
eaglewingone
Communications Officer
 
eaglewingone's Avatar
 
Join Date: Apr 2009
Location: Los Angeles,CA
Posts: 1,206
Default

Quote:
Originally Posted by Dr Kane View Post
Thanks for that. There are some nice pics at: http://www.flickr.com/groups/ares/pool/
No Problem
eaglewingone is off duty   Bookmark and Share Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 02:50 PM.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
This site and contents are copyright Bernard Walsh 2010 all rights reserved, no reproduction of material in any form without written permission email: Bernie.walsh@mac.com